Sign in

News and Resources on Data Centers, Energy, AI, Privacy and Government

Monday, November 23, 2026 Online Edition

All media

204 items. Videos and audio load only when you press play.

TitleTypeSectionsFormatSizeAdded ▲
Twin Falls County Wrote Gas Out: Energy Code Brief (Rev. 1.2)Series: South Hills - Milner Project · Part 37Research brief and evidence record, Nov. 19, 2026. Shows how natural gas power plants dropped out of Twin Falls County's energy code between 2022 and 2026, and why the South Hills plant is moving ahead on a building permit alone.twin-falls-county-wrote-gas-out-energy-code-brief-rev-1-2-a9f4f3.docx · DownloadDocumentEnergy, Local & State, ResearchDOCX7.9 MBNovember 23, 2026
Silver Spur and the South Hills Gas Plant: Research BriefSeries: South Hills - Milner Project · Part 36Compiled Nov. 20, 2026. Gas route, fuel math, pipeline capacity, equipment and timeline for the Silver Spur pipeline and Idaho Power's South Hills plant near Milner Dam.silver-spur-and-south-hills-research-brief-2026-11-20-baed4b.docx · DownloadDocumentEnergy, ResearchDOCX30 KBNovember 23, 2026
SWIP-N: Who Owns It, Who Governs It, and What the Latest FERC and CAISO Actions MeanSeries: SWIP-N · Part 2October 2025 brief on the Southwest Intertie Project-North: the Great Basin Transmission and LS Power ownership split, CAISO control of capacity, and the block tied to Idaho Power.swip-n-brief-2025-10-25-17f594.docx · DownloadDocumentEnergy, ResearchDOCX50 KBNovember 23, 2026
Protect Idaho Communities From Incompatible Data Center DevelopmentProposed public policy brief, revision 2, Oct. 31, 2026. Argues that communities should hold large data center proposals to the law, protect agricultural and rural residential districts, refuse new discretionary subsidies and make developers carry their own costs.protect-idaho-communities-from-incompatible-data-center-development-rev02-961610.docx · DownloadDocumentHyperscale, Local & State, ResearchDOCX40 KBNovember 23, 2026
Idaho Property Tax: Research and Publishing DossierSeries: Property Tax · Part 5Verified Oct. 12, 2026. Idaho property tax facts, comparison models from other states, reform arguments and counterarguments, and a source register.property-tax-research-and-publishing-dossier-870df5.docx · DownloadDocumentLocal & State, Politics, ResearchDOCX45 KBNovember 23, 2026
The $2.174 Billion Bill: Idaho Property Tax Research PacketSeries: Property Tax · Part 4Background, other-state comparisons, posts, infographic and citations on Idaho property taxes: 2025 levy budgets, state relief and what replacing the tax would take.property-tax-research-packet-aea69f.docx · DownloadDocumentLocal & State, Politics, ResearchDOCX260 KBNovember 23, 2026
Milner Gas Power Plant (South Hills): Briefing Addendum 1 (Rev. 2)Series: South Hills - Milner Project · Part 35Supplement to the Milner Area Power Projects Briefing rev 4, status as of Nov. 18, 2026. Collects what turned up after rev 4: the gap review downloads, the Twin Falls County records search and the gap audit.milner-gas-power-plant-south-hills-briefing-addendum-1-rev-2-943eb0.docx · DownloadDocumentEnergy, Local & State, ResearchDOCX31 KBNovember 23, 2026
Milner Area Power Projects Briefing, Addendum A: Twin Falls County RecordsSeries: South Hills - Milner Project · Part 34Addendum to Briefing rev 4, status as of Nov. 18, 2026. What Twin Falls County's own records show about the Milner gas plant, what follows for neighbors and the county, and a legal and ethical analysis.milner-area-power-projects-briefing-rev-4-addendum-a-twin-falls-county-records-649d72.docx · DownloadDocumentEnergy, Local & State, ResearchDOCX22 KBNovember 23, 2026
Milner Area Power Projects Briefing (Rev. 4)Series: South Hills - Milner Project · Part 33Briefing guide, status as of Nov. 18, 2026. Quick answers and the full record on the power projects around Milner Dam, including where the Idaho Public Utilities Commission case stands.milner-area-power-projects-briefing-rev-4-419438.docx · DownloadDocumentEnergy, Local & State, ResearchDOCX1.5 MBNovember 23, 2026
Legislative Briefing: Idaho State Energy Sovereignty (HCR 32)Summary of House Concurrent Resolution 32, which sets out an energy sovereignty framework for Idaho: ratepayer protection, in-state base load generation and standards for new transmission.legislative-briefing-idaho-energy-sovereignty-hcr-32-6067bf.docx · DownloadDocumentEnergy, Local & State, ResearchDOCX19 KBNovember 23, 2026
Property Taxes and Citizen Burdens: How a County Commissioner Affects What You PaySeries: Property Tax · Part 3Policy briefing for Jerry L. Holton's 2026 commissioner campaign on the budget, tax breaks, growth and long-term obligations a commissioner controls.jerry-holton-property-tax-citizen-burdens-brief-ff3a2f.docx · DownloadDocumentLocal & State, Politics, ResearchDOCX44 KBNovember 23, 2026
Property Taxes and Citizen Burdens in Jerome County (Final)Series: Property Tax · Part 2Policy briefing for Jerry L. Holton's 2026 commissioner campaign on how a county commissioner affects what residents pay, and what Jerome County's own records already show.jerry-holton-property-tax-brief-final-8960f1.docx · DownloadDocumentLocal & State, Politics, ResearchDOCX54 KBNovember 23, 2026
Urban Renewal in Jerome County: A Plain-Language Brief for CitizensSeries: Property Tax · Part 1Explains how the Jerome County Urban Renewal Agency captures new property taxes and repays developers for infrastructure, and what that means for the county, schools and other taxing districts.jerome-urban-renewal-citizen-brief-a32313.docx · DownloadDocumentLocal & State, ResearchDOCX13 KBNovember 23, 2026
Jerome County Investment BriefPolicy briefing on what the county's audits show about the Treasurer's claim of strong investment returns: interest income, the lack of a written investment policy and uninsured deposits. Prepared for Jerry L. Holton's 2026 commissioner campaign.jerome-county-investment-brief-16854a.docx · DownloadDocumentLocal & State, Politics, ResearchDOCX53 KBNovember 23, 2026
Jerome County: Citizen Burdens, Budget, Urban Renewal, Investments and TransparencyConsolidated policy briefing compiled May 2026 for Jerry L. Holton, candidate for Jerome County Commissioner, District 2. Drawn from county audits for FY2021 to FY2024, the FY2024-25 budget, urban renewal agency financials and meeting minutes.jerome-county-consolidated-citizen-brief-4c3ecf.docx · DownloadDocumentLocal & State, Politics, ResearchDOCX59 KBNovember 23, 2026
BESS Technology, Safety and Community Impact BriefingMarch 2026 reference for communities facing battery energy storage proposals. Covers the technology, failure events sorted by risk category, safety systems and community impact.bess-technology-safety-and-community-impact-briefing-d38ca6.docx · DownloadDocumentEnergy, Local & State, ResearchDOCX54 KBNovember 23, 2026
The Regulation of Energy Production in Twin Falls County (Rev. 1)Series: South Hills - Milner Project · Part 32Research brief current to Nov. 19, 2026. Traces the legislative history of Twin Falls County's energy rules and Ordinance 282, and tests whether the 222 MW South Hills gas plant near Milner Dam is subject to discretionary land-use review.milner-energy-production-brief-rev01-f054a7.docx · DownloadDocumentEnergy, Local & State, ResearchDOCX48 KBNovember 23, 2026
Milner Gas Power Plant: Accountability Findings, Executive SummarySeries: South Hills - Milner Project · Part 31Research file, status as of Nov. 18, 2026. Summarizes 21 findings from the public record on Idaho Power's 222 MW South Hills gas plant near Milner Dam, nine of them rated high severity.milner-accountability-findings-executive-summary-52b4c6.docx · DownloadDocumentEnergy, ResearchDOCX11 KBNovember 23, 2026
Legitimate Limits on Energy and Data Center DevelopmentJuly 2026 brief on which limits on energy and data center growth are legitimate, on private land and on public land, measured against constitutional authority, two views of liberty, and ordered liberty.legitimate-limits-on-energy-and-data-center-development-v1-1521a5.docx · DownloadDocumentEnergy, Hyperscale, ResearchDOCX13 KBNovember 23, 2026
Idaho Federal Water Lawsuit and the Case Against a Broad ExemptionAdvocacy briefing dated Oct. 31, 2026, on the federal lawsuit over Idaho Department of Water Resources authority. Explains six separate frameworks, the federal position and the factual limits of the argument against a broad exemption for federal operations.idaho-federal-water-lawsuit-public-briefing-961898.docx · DownloadDocumentEnvironment, Local & State, ResearchDOCX54 KBNovember 23, 2026
Idaho Grocery Tax: Research and Publishing DossierSeries: Sales Tax · Part 2Verified Oct. 12, 2026. Examines repeal or reform of Idaho's sales tax on groceries, with the case for repeal, the strongest fiscal objections, legislative design questions and a source register.grocery-tax-research-and-publishing-dossier-c313dc.docx · DownloadDocumentLocal & State, Politics, ResearchDOCX45 KBNovember 23, 2026
End the Checkout Shakedown: Idaho Grocery Tax Research PacketSeries: Sales Tax · Part 1Background, other-state comparisons, posts, infographic and citations on Idaho's 6% sales tax on food, the $155 grocery credit and the cost of repeal.grocery-tax-research-packet-5a41ba.docx · DownloadDocumentLocal & State, Politics, ResearchDOCX221 KBNovember 23, 2026
Garciaguirre v. Samsung Electronics: The DRAM Supply Case SurvivesResearch brief on the Nov. 14, 2026 order denying the motion to dismiss in the class action accusing Samsung, SK Hynix and Micron of restricting DRAM supply. U.S. District Court, Northern District of California, Case No. 5:26-cv-06345-NW.garciaguirre-v-samsung-dram-brief-2026-11-17-845aa5.docx · DownloadDocumentAI, National, ResearchDOCX22 KBNovember 23, 2026
Automated License Plate Readers: U.S. Research DossierPublic record review covering Nov. 8, 2023 to Nov. 7, 2026 of Flock Safety, Axon Enterprise and Motorola Solutions. Covers products and markets, agency oversight findings, officer misconduct cases, lawsuits and records requests.alpr-research-dossier-bc6bf6.docx · DownloadDocumentNational, Privacy, ResearchDOCX898 KBNovember 23, 2026
BAAJA in the Senate: The Nov. 18, 2026 VotesBriefing on the three Senate roll calls of Nov. 18, 2026 that cleared the last 60-vote hurdle for the Bipartisan American Affordability and Jobs Act, including the 65-31 final cloture vote and what has to happen next.baaja-senate-votes-briefing-2026-11-18-5e2bed.docx · DownloadDocumentEnergy, National, ResearchDOCX14 KBNovember 23, 2026
TerraVolt Fact CheckSeries: Delco Idaho Data Center Campus · Part 17fact-check-terravolt-declo-c0db5f.docx · DownloadDocumentAI, Energy, Hyperscale, ResearchDOCX23 KBNovember 23, 2026
Milner -South Hills BriefingSeries: South Hills - Milner Project · Part 38The Milner gas power plant briefings compiled into one PDF, revision 3. Covers the plant proposed near Milner Dam, also known as the South Hills project, and the places where the public record on it conflicts.00-milner-briefings-compiled-rev-3-408db1.pdf · DownloadDocumentDaily News & Briefs, Energy, ResearchPDF4.3 MBNovember 23, 2026
Feeding the Beast Brief, Nov. 23, 2026Vol. I, No. 6.feeding-the-beast-brief-2026-11-23-feca8e.pdf · DownloadDocumentFeeding the BeastPDF4.9 MBNovember 23, 2026
Who Owns Idaho's Power Future?Series: 2025 Article Images · Part 19who-owns-idahos-power-future-2828d2.png · DownloadImageImagesPNG1.9 MBNovember 23, 2026
Who Owns Idaho's Power Future? (social)Series: 2025 Article Images · Part 20who-owns-idahos-power-future-social-155828.png · DownloadImageImagesPNG530 KBNovember 23, 2026
What You Need to Know: SWIP-N Cost Recovery (second copy)Series: 2025 Article Images · Part 18what-you-need-to-know-swip-n-cost-recovery-second-copy-40d2ea.png · DownloadImageImagesPNG873 KBNovember 23, 2026
What You Need to Know: FERC Approved Cost Recovery for SWIP-NSeries: SWIP-N · Part 1what-you-need-to-know-ferc-approved-cost-recovery-for-swip-n-9ac71d.png · DownloadImageImagesPNG872 KBNovember 23, 2026
What Is the Worst Political Joke in Idaho?Series: 2025 Article Images · Part 17what-is-the-worst-political-joke-in-idaho-ef4bcb.png · DownloadImageImagesPNG1.3 MBNovember 23, 2026
What Is Happening in Jerome County?Series: 2025 Article Images · Part 16what-is-happening-in-jerome-county-e4eabb.png · DownloadImageImagesPNG1.4 MBNovember 23, 2026
What Happens Behind Closed Doors Is Often IllegalSeries: 2025 Article Images · Part 15what-happens-behind-closed-doors-is-often-illegal-5eaa85.png · DownloadImageImagesPNG569 KBNovember 23, 2026
We Demand Vague SolutionsSeries: 2025 Article Images · Part 14we-demand-vague-solutions-422e6b.png · DownloadImageImagesPNG1.3 MBNovember 23, 2026
Tied Up in Property Tax Red TapeSeries: 2025 Article Images · Part 13tied-up-in-property-tax-red-tape-5982c9.png · DownloadImageImagesPNG2.3 MBNovember 23, 2026
The Uses of AIthe-uses-of-ai-e84d97.png · DownloadImageEditorial CartoonsPNG1.1 MBNovember 23, 2026
The Uses of AI (updated)the-uses-of-ai-updated-008f55.png · DownloadImageEditorial CartoonsPNG1 MBNovember 23, 2026
The Tyranny of 'Trust Me' GovernmentSeries: 2025 Article Images · Part 12the-tyranny-of-trust-me-government-2a197e.png · DownloadImageImagesPNG582 KBNovember 23, 2026
The Strawman Cometh: His Name Is Christian NationalismSeries: 2025 Article Images · Part 58the-strawman-cometh-his-name-is-christian-nationalism-b4be11.png · DownloadImageImagesPNG1.6 MBNovember 23, 2026
The Replacement of Stewardship with TechnocracySeries: 2025 Article Images · Part 57the-replacement-of-stewardship-with-technocracy-086479.png · DownloadImageImagesPNG2 MBNovember 23, 2026
The Politics of Intimidation in Small-Town IdahoSeries: 2025 Article Images · Part 55the-politics-of-intimidation-in-small-town-idaho-169ffb.webp · DownloadImageImagesWEBP83 KBNovember 23, 2026
The Politics of Intimidation in Small-Town Idaho: The Vote No SignSeries: 2025 Article Images · Part 56the-politics-of-intimidation-in-small-town-idaho-the-vote-no-sign-118424.png · DownloadImageImagesPNG622 KBNovember 23, 2026
The Legacy of Revolutionary Language WarfareSeries: 2025 Article Images · Part 54the-legacy-of-revolutionary-language-warfare-0d2412.png · DownloadImageImagesPNG1.4 MBNovember 23, 2026
The H-Blocks and the American IdentitySeries: 2025 Article Images · Part 53the-h-blocks-and-the-american-identity-5983ac.png · DownloadImageImagesPNG1.3 MBNovember 23, 2026
The Democrats Getting Their Slither OnSeries: 2025 Article Images · Part 52the-democrats-getting-their-slither-on-9b4a60.jpg · DownloadImageImagesJPG163 KBNovember 23, 2026
The Conditional Republic: Why the Constitution Was Never EnoughSeries: 2025 Article Images · Part 51the-conditional-republic-why-the-constitution-was-never-enough-7c93f8.png · DownloadImageImagesPNG937 KBNovember 23, 2026
The Ascension of Fidelisthe-ascension-of-fidelis-a8e88f.png · DownloadImageImagesPNG3.2 MBNovember 23, 2026
Technocracy Threatens IdahoSeries: 2025 Article Images · Part 50technocracy-threatens-idaho-e5e660.png · DownloadImageImagesPNG1.8 MBNovember 23, 2026
Technocracy Is the Threat to Idaho, Not TechnologySeries: 2025 Article Images · Part 49technocracy-is-the-threat-to-idaho-not-technology-332051.jpg · DownloadImageImagesJPG1.1 MBNovember 23, 2026
Technocracy Is the Problem, Not TechnologySeries: 2025 Article Images · Part 48technocracy-is-the-problem-not-technology-d7d396.png · DownloadImageImagesPNG1.7 MBNovember 23, 2026
Tax QuestSeries: 2025 Article Images · Part 11tax-quest-4c75b2.png · DownloadImageImagesPNG3 MBNovember 23, 2026
So Why Charge the Grocery Tax at All?Series: 2025 Article Images · Part 10so-why-charge-the-grocery-tax-at-all-818442.jpg · DownloadImageImagesJPG578 KBNovember 23, 2026
Shooting Yourself in the FootSeries: 2025 Article Images · Part 47shooting-yourself-in-the-foot-22c7b7.jpg · DownloadImageImagesJPG346 KBNovember 23, 2026
School Choice: Is Someone Trying to Block the Exit?Series: 2025 Article Images · Part 46school-choice-is-someone-trying-to-block-the-exit-503c0a.jpg · DownloadImageImagesJPG164 KBNovember 23, 2026
Regulated Public Utilities Should Not Be Able to Influence Political CampaignsSeries: 2025 Article Images · Part 45regulated-public-utilities-should-not-be-able-to-influence-political-c-b9b307.png · DownloadImageImagesPNG407 KBNovember 23, 2026
Property Tax ForeclosureSeries: 2025 Article Images · Part 9property-tax-foreclosure-d96240.png · DownloadImageImagesPNG2.2 MBNovember 23, 2026
No Negotiation at the Tax OfficeSeries: 2025 Article Images · Part 8no-negotiation-at-the-tax-office-bdffc5.png · DownloadImageImagesPNG5.3 MBNovember 23, 2026
No Kings: An Autocratic Breakthrough or Gaslighting?Series: 2025 Article Images · Part 44no-kings-an-autocratic-breakthrough-or-gaslighting-492f79.jpg · DownloadImageImagesJPG21 KBNovember 23, 2026
Losing Faith in Local Government: What the Record ShowsSeries: 2025 Article Images · Part 42losing-faith-in-local-government-what-the-record-shows-53cba5.png · DownloadImageImagesPNG601 KBNovember 23, 2026
Losing Faith in Local Government: What the Record Shows (second copy)Series: 2025 Article Images · Part 43losing-faith-in-local-government-what-the-record-shows-second-copy-79219e.png · DownloadImageImagesPNG601 KBNovember 23, 2026
Losing Faith in Local Government: Procedure Over EthicsSeries: 2025 Article Images · Part 41losing-faith-in-local-government-procedure-over-ethics-074481.png · DownloadImageImagesPNG601 KBNovember 23, 2026
Losing Faith in Local Government: Dismissive LanguageSeries: 2025 Article Images · Part 40losing-faith-in-local-government-dismissive-language-ddf200.png · DownloadImageImagesPNG602 KBNovember 23, 2026
Losing Faith in Local Government: A Path to ClaritySeries: 2025 Article Images · Part 39losing-faith-in-local-government-a-path-to-clarity-f0af76.png · DownloadImageImagesPNG604 KBNovember 23, 2026
Leaders Have Storiesleaders-have-stories-9ae7b0.jpg · DownloadImageImagesJPG106 KBNovember 23, 2026
Jerome County Commission Gun Ban Update, Oct. 6, 2025Series: 2025 Article Images · Part 38jerome-county-commission-gun-ban-update-oct-6-2025-1181bb.png · DownloadImageImagesPNG446 KBNovember 23, 2026
Jerome County Commission Gun Ban Update, Oct. 5, 2025Series: 2025 Article Images · Part 37jerome-county-commission-gun-ban-update-oct-5-2025-a39f1e.png · DownloadImageImagesPNG487 KBNovember 23, 2026
It's No Joke: The Grocery TaxSeries: 2025 Article Images · Part 7its-no-joke-the-grocery-tax-d62ed9.png · DownloadImageImagesPNG1.1 MBNovember 23, 2026
Ideological Conditioning: How No Kings and Indivisible Mirror Cult RecruitmentSeries: 2025 Article Images · Part 36ideological-conditioning-how-no-kings-and-indivisible-mirror-cult-recr-a40b1e.png · DownloadImageImagesPNG1.3 MBNovember 23, 2026
Idaho's Regressive Grocery Tax: The Less You Earn, the Tighter the SqueezeSeries: 2025 Article Images · Part 6idahos-regressive-grocery-tax-the-less-you-earn-the-tighter-the-squeez-1cf99d.png · DownloadImageImagesPNG6.1 MBNovember 23, 2026
Idaho Families Deserve BetterSeries: 2025 Article Images · Part 35idaho-families-deserve-better-cd9c2f.jpg · DownloadImageImagesJPG464 KBNovember 23, 2026
Idaho 20/200: Who Decides Idaho's Future?Series: 2025 Article Images · Part 25idaho-20-200-who-decides-idahos-future-8119df.png · DownloadImageImagesPNG3.9 MBNovember 23, 2026
Idaho 20/200: Who Benefits from Corporate Incentives?Series: 2025 Article Images · Part 24idaho-20-200-who-benefits-from-corporate-incentives-099a10.png · DownloadImageImagesPNG1.7 MBNovember 23, 2026
Idaho 20/200: The Broken Promise of ProsperitySeries: 2025 Article Images · Part 22idaho-20-200-the-broken-promise-of-prosperity-56c17e.png · DownloadImageImagesPNG1.9 MBNovember 23, 2026
Idaho 20/200: The Broken Promise of Prosperity (framed)Series: 2025 Article Images · Part 23idaho-20-200-the-broken-promise-of-prosperity-framed-13477f.png · DownloadImageImagesPNG2.2 MBNovember 23, 2026
Idaho 20/200: Dystopian OutcomesSeries: 2025 Article Images · Part 21idaho-20-200-dystopian-outcomes-9bf352.png · DownloadImageImagesPNG2.2 MBNovember 23, 2026
How No Kings Defines Freedom, Rights and ConscienceSeries: 2025 Article Images · Part 34how-no-kings-defines-freedom-rights-and-conscience-d551aa.jpg · DownloadImageImagesJPG21 KBNovember 23, 2026
Higher Criticism: The Trojan Horse That Led the 20th Century to Reject the BibleSeries: 2025 Article Images · Part 33higher-criticism-the-trojan-horse-that-led-the-20th-century-to-reject-db6489.png · DownloadImageImagesPNG3.3 MBNovember 23, 2026
Francis Schaeffer on Money and Timefrancis-schaeffer-on-money-and-time-108c8a.png · DownloadImageImagesPNG1.8 MBNovember 23, 2026
Food Is Not a LuxurySeries: 2025 Article Images · Part 31food-is-not-a-luxury-5531cd.jpg · DownloadImageImagesJPG93 KBNovember 23, 2026
Food Is Not a Luxury (orange)Series: 2025 Article Images · Part 32food-is-not-a-luxury-orange-afb982.jpg · DownloadImageImagesJPG118 KBNovember 23, 2026
Famous Baked PotatoesSeries: 2025 Article Images · Part 30famous-baked-potatoes-819a0e.png · DownloadImageImagesPNG978 KBNovember 23, 2026
Executive Session Gone WrongSeries: 2025 Article Images · Part 29executive-session-gone-wrong-4f675b.png · DownloadImageImagesPNG575 KBNovember 23, 2026
Enforcing TransparencySeries: 2025 Article Images · Part 28enforcing-transparency-5590ea.png · DownloadImageImagesPNG582 KBNovember 23, 2026
Ending the Grocery Tax Isn't a Left-Right IssueSeries: 2025 Article Images · Part 5ending-the-grocery-tax-isnt-a-left-right-issue-5cc754.jpg · DownloadImageImagesJPG117 KBNovember 23, 2026
The Trojan EmployerSeries: Economic Development · Part 8economic-development-the-trojan-employer-9a059c.png · DownloadImageEditorial CartoonsPNG3 MBNovember 23, 2026
The Revolving DoorSeries: Economic Development · Part 4economic-development-the-revolving-door-7420f6.png · DownloadImageEditorial CartoonsPNG2.8 MBNovember 23, 2026
The Public-Private PartnershipSeries: Economic Development · Part 2economic-development-the-public-private-partnership-516b05.png · DownloadImageEditorial CartoonsPNG2.4 MBNovember 23, 2026
The Public-Private Partnership (alternate)Series: Economic Development · Part 6economic-development-the-public-private-partnership-alternate-e52094.png · DownloadImageEditorial CartoonsPNG2.7 MBNovember 23, 2026
The One-Way PartnershipSeries: Economic Development · Part 7economic-development-the-one-way-partnership-cb5693.png · DownloadImageEditorial CartoonsPNG3.1 MBNovember 23, 2026
The Blank CheckSeries: Economic Development · Part 1economic-development-the-blank-check-b6c8e6.png · DownloadImageEditorial CartoonsPNG2.8 MBNovember 23, 2026
Public InputSeries: Economic Development · Part 5economic-development-public-input-ac81b4.png · DownloadImageEditorial CartoonsPNG1.7 MBNovember 23, 2026
Groundbreaking the TaxpayerSeries: 2025 Article Images · Part 4economic-development-groundbreaking-the-taxpayer-bdf2d4.png · DownloadImageEditorial CartoonsPNG3.1 MBNovember 23, 2026
Dear Ronnie, Who Is Advising Jerome County?Series: 2025 Article Images · Part 27dear-ronnie-who-is-advising-jerome-county-c10d5e.png · DownloadImageImagesPNG2 MBNovember 23, 2026
Crushed Under the Property Tax BurdenSeries: 2025 Article Images · Part 3crushed-under-the-property-tax-burden-f70955.jpg · DownloadImageImagesJPG257 KBNovember 23, 2026
Community Alert: SWIP Power Line Hearing, Oct. 7community-alert-swip-power-line-hearing-oct-7-b33b29.jpg · DownloadImageImagesJPG146 KBNovember 23, 2026
California News: Clean Green Nightmarecalifornia-news-clean-green-nightmare-1eea22.png · DownloadImageImagesPNG2.3 MBNovember 23, 2026
Boomtowns and Burnout: Idaho's New Industrial RushSeries: 2025 Article Images · Part 26boomtowns-and-burnout-idahos-new-industrial-rush-23ac25.png · DownloadImageImagesPNG3.3 MBNovember 23, 2026
Are These Luxury or Survival Items? The 6% Grocery TaxSeries: 2025 Article Images · Part 2are-these-luxury-or-survival-items-the-6-percent-grocery-tax-7d4c56.jpg · DownloadImageImagesJPG88 KBNovember 23, 2026
Are Economic Development Organizations Socialized Shadow Governments?Series: Economic Development · Part 9are-economic-development-organizations-socialized-shadow-governments-78d950.jpg · DownloadImageImagesJPG290 KBNovember 23, 2026
America's Power Bills and AI Data Centers (wide)americas-power-bills-and-ai-data-centers-wide-52ec2f.png · DownloadImageImagesPNG2.1 MBNovember 23, 2026
America's Power Bills and AI Data Centers: Review of Glenn Beck's Programamericas-power-bills-and-ai-data-centers-review-of-glenn-becks-program-2a6234.png · DownloadImageImagesPNG2.1 MBNovember 23, 2026
A Meeting Without Complete, Clear Minutes Is Unethicala-meeting-without-complete-clear-minutes-is-unethical-5c63e4.png · DownloadImageImagesPNG734 KBNovember 23, 2026
6% Survival Tax or Loan to the State of Idaho?Series: 2025 Article Images · Part 16-percent-survival-tax-or-loan-to-the-state-of-idaho-1899a2.jpg · DownloadImageImagesJPG310 KBNovember 23, 2026
Feeding the Beast, Part Two: Who Pays, Who Decides (Slide Deck)No subsidies, no hidden grid costs, no secret deals: what tax breaks cost other states, how data centers land on power bills, NDAs, and five lines for a county ordinance.who-pays-who-decides-r2-001714.pdf · DownloadSlidesHyperscale, Local & StatePDF2.3 MBNovember 22, 2026
Feeding the Beast, Part Three: Who Holds the Bag (Slide Deck)When the AI boom cools, investors move on and ratepayers are left paying for the plants, lines and substations. Six contract terms that keep the risk with the customer who caused it.who-holds-the-bag-r2-1d0a8a.pdf · DownloadSlidesHyperscale, Local & StatePDF1.1 MBNovember 22, 2026
What Data Centers Do (Slide Deck)The services data centers support, the workloads worth questioning, what national power forecasts can and cannot tell a county, and how capacity markets and rate cases put costs on bills.what-data-centers-do-r2-d4552f.pdf · DownloadSlidesHyperscale, Local & StatePDF1.8 MBNovember 22, 2026
The Limits of the Right to Build (Slide Deck)Property rights, uncompensated impacts and rural communities: takings law, nexus and proportionality, notice that matches impact, and Idaho HCR 32 on major transmission lines.the-limits-of-the-right-to-build-r2-7d7df1.pdf · DownloadSlidesHyperscale, Local & StatePDF4 MBNovember 22, 2026
Before the County Says Yes (Slide Deck)A public test for hyperscale proposals: who the customer is, where the campus can go, who pays for power and water, notice and hearings, and a closure bond before the first shovel.before-the-county-says-yes-r2-80d8cb.pdf · DownloadSlidesHyperscale, Local & StatePDF2.2 MBNovember 22, 2026
The Public Should Not Underwrite the Data Center RushThe case for ending discretionary data center recruitment subsidies and adopting enforceable community protections.the-public-should-not-underwrite-data-centers-rev5-947b1a.pdf · DownloadDocumentHyperscale, Local & StatePDF271 KBNovember 22, 2026
Model Data Center Zoning Ordinance (Draft Revision 5)A model county and city ordinance that classifies data centers by power demand and sets siting, water, power, notice, hearing and closure-bond rules.model-data-center-zoning-ordinance-draft-rev5-ce2f33.pdf · DownloadDocumentHyperscale, Local & StatePDF422 KBNovember 22, 2026
Data Center Development and the Rights of the Community (Position Paper, Rev. 5)Jeff A. Pierson's position on data center development: no public subsidies, full cost recovery from the developer, protection of farmland and water, and real local say.data-center-policy-position-rev5-dc1335.pdf · DownloadDocumentHyperscale, Local & StatePDF551 KBNovember 22, 2026
Milner Gas Plant: Eminent Domain on the Table, Dec. 9Series: South Hills - Milner Project · Part 16Vertical video, 1:48. The Silver Spur pipeline would run about 88 miles of 24-inch pipe from Elko County, Nevada, to Twin Falls County, with Idaho Power reported at 175,000 of about 275,000 dekatherms a day. FERC's scoping session is Dec. 9, 5 to 8 p.m., in Twin Falls; written comments are due Dec. 14 on docket PF26-15. Check the docket before you go. Narrated by Laurel, an ElevenLabs voice.milner-gas-plant-05-eminent-domain-on-the-table-vertical-v4-laurel-19mb-87c3ed.mp4 · Download
Play
VideoEnergy, Local & StateMP46.1 MBNovember 22, 2026
Milner Gas Plant: 88 Percent From the Biggest CustomersSeries: South Hills - Milner Project · Part 15Vertical video, 1:52. Idaho Power says the plant serves the Magic Valley. Its own forecast, per PUC staff, has the largest-customer class growing from 258 to 875 average megawatts by 2030, 88 percent of all system growth, with Micron's fab about 445. Comments on large-load costs in IPC-E-26-07 are due Dec. 14. Idaho PUC: 208-334-0300. Narrated by Laurel, an ElevenLabs voice.milner-gas-plant-04-88-percent-big-customers-vertical-v4-laurel-19mb-7f2d58.mp4 · Download
Play
VideoEnergy, Local & StateMP45.9 MBNovember 22, 2026
Milner Gas Plant: Idaho Power Changed the NameSeries: South Hills - Milner Project · Part 14Vertical video, 1:38. The PUC's two formal notices never say Milner or Twin Falls County. The same plant went from "Milner 60 MW BESS" to "Milner gas resource" to "South Hills," the name of the mountains south of Twin Falls. To follow it, search both names in state case IPC-E-26-04. Narrated by Laurel, an ElevenLabs voice.milner-gas-plant-03-idaho-power-changed-the-name-vertical-v4-laurel-19mb-d27eb3.mp4 · Download
Play
VideoEnergy, Local & StateMP46 MBNovember 22, 2026
Milner Gas Plant: Next DoorSeries: South Hills - Milner Project · Part 13Vertical video, 1:41. Idaho Power's gas plant of up to 222 megawatts, now filed as South Hills, would sit on a 20-acre parcel next to Milner Dam. Idaho Power testified Twin Falls County requires only a building permit, and the farm zone rules the county adopted in August 2026 list public utility buildings as a permitted use. Twin Falls County commissioners: 208-736-4068. Narrated by Laurel, an ElevenLabs voice.milner-gas-plant-01-next-door-vertical-v2-laurel-19mb-2878f0.mp4 · Download
Play
VideoEnergy, Local & StateMP418 MBNovember 22, 2026
Milner Gas Power Plant (South Hills): Expanded BriefingSeries: South Hills - Milner Project · Part 2Research file · Revision 3, status as of Nov. 19, 2026. Quick answers and the full record on Idaho Power's 222 MW gas plant next to Milner Dam: what it is, where the PUC case stands, the permits, the pipeline and the open questions.milner-gas-power-plant-expanded-briefing-rev-3-6873ef.pdf · DownloadDocumentEnergy, Local & State, ResearchPDF1.5 MBNovember 22, 2026
Milner Gas Power Plant (South Hills): Inconsistencies in the RecordSeries: South Hills - Milner Project · Part 1Mini brief · Revision 2, status as of Nov. 19, 2026. Statements in the record set side by side that can't both be fully right as written, and which ones the record now settles.draft-milner-gas-power-plant-inconsistencies-mini-brief-rev-2-4222ae.pdf · DownloadDocumentEnergy, Local & State, ResearchPDF147 KBNovember 22, 2026
Idaho's Data Center, Nuclear and Energy Decisions, 2016 to 2026Report · Revision 5, November 2026. The deals made in Idaho's name, and the say Idaho still has left. A state, regional and national report on a decade of data center, nuclear and energy decisions.idaho-energy-report-2016-2026-r5-f09186.pdf · DownloadDocumentEnergy, Hyperscale, Local & State, NationalPDF708 KBNovember 22, 2026
Calling It Patriotism Doesn't Make It TrueColumn with citations · Revision 5, November 2026. How supporting data centers became a loyalty test, and why conservatives should reject it.calling-it-patriotism-cited-nov2026-r5-f16af5.pdf · DownloadDocumentHyperscale, PoliticsPDF318 KBNovember 22, 2026
Guide 10: Eminent Domain in Idaho, and What BAAJA Would ChangeSeries: Guides · Part 20Booklet · Idaho Data Center Public Guide 10 · Version 1. Who can take Idaho land today, how the process works, and how a federal permitting bill now in the House would let power line developers condemn rights-of-way in federal court.guide-10-eminent-domain-in-idaho-and-baaja-v1-c47f2f.pdf · DownloadDocumentBooklets and Guides, Energy, HyperscalePDF397 KBNovember 22, 2026
Guide 9: Open Meetings and Public Records in IdahoSeries: Guides · Part 19Booklet · Idaho Data Center Public Guide 9 of 9 · Version 3. How the Open Meeting Law and the Public Records Act work, how to write a records request that gets answered, where to file a complaint, and where the laws fall short.guide-09-open-meetings-and-public-records-v3-3b1b1b.pdf · DownloadDocumentBooklets and Guides, HyperscalePDF442 KBNovember 22, 2026
Guide 8: Idaho's 2026 Data Center Laws and Where They're WeakSeries: Guides · Part 17Booklet · Idaho Data Center Public Guide 8 of 9 · Version 5. Two bills became law July 1, 2026, one for water and one for power. A third, on tax breaks, died with no one on record against it. What each does, and where enforcement falls short.guide-08-idaho-2026-data-center-laws-and-their-gaps-v5-f7382e.pdf · DownloadDocumentBooklets and Guides, HyperscalePDF338 KBNovember 22, 2026
Guide 7: Speculative Data Centers: The Declo ExampleSeries: Guides · Part 15Booklet · Idaho Data Center Public Guide 7 of 9 · Version 14. Some data center projects start with a customer. Others start with a land option, a gas contract and a press release. This guide explains how the second kind works, using the project announced outside Declo in October 2026.guide-07-speculative-data-centers-the-declo-example-v14-2f2aea.pdf · DownloadDocumentBooklets and Guides, HyperscalePDF654 KBNovember 22, 2026
Guide 5 Supplement: Warning Signs When Big Money Meets Local DecisionsSeries: Guides · Part 12Booklet · Idaho Data Center Public Guide 5, Supplement · Version 4. Hyperscale projects bring more money to a county commission than most rural counties see in a generation. Here's what pressure and conflicts of interest have looked like elsewhere, and how to spot them early.guide-05-supplement-warning-signs-of-undue-influence-v4-7b64fc.pdf · DownloadDocumentBooklets and GuidesPDF266 KBNovember 22, 2026
Guide 5: Idaho Utility Campaign Money and Public DecisionsSeries: Guides · Part 10Booklet · Idaho Data Center Public Guide 5 of 9 · Version 9. What Idaho Power and its parent company's employee PAC gave, what lawmakers and regulators decided from 2016 to 2026, and how to read the two side by side.guide-05-idaho-utility-campaign-money-and-public-decisions-v9-6fdaeb.pdf · DownloadDocumentBooklets and Guides, HyperscalePDF595 KBNovember 22, 2026
Guide 4: Farmland Doesn't Come Back EasySeries: Guides · Part 8Booklet · Idaho Data Center Public Guide 4 of 9 · Version 8. What happens to farm ground and sagebrush after solar, wind and data center projects are built and torn down, and why Idaho should keep them off its best land in the first place.guide-04-farmland-after-industrial-decommissioning-v8-1cb958.pdf · DownloadDocumentBooklets and Guides, Energy, Hyperscale, Local & StatePDF311 KBNovember 22, 2026
Guide 3: What Idaho Counties Can Enforce on Data CentersSeries: Guides · Part 6Booklet · Idaho Data Center Public Guide 3 of 9 · Version 6. Where a county's zoning power is strong, where state agencies take over, and how to write conditions an inspector can actually check.guide-03-what-idaho-counties-can-enforce-v6-63112a.pdf · DownloadDocumentBooklets and Guides, Energy, Hyperscale, Local & StatePDF387 KBNovember 22, 2026
Guide 2: What Operating Data Centers DeliveredSeries: Guides · Part 4Booklet · Idaho Data Center Public Guide 2 of 9 · Version 6. Jobs, taxes and public costs after the ribbon cutting, from Meta's campus near Boise to Oregon and Virginia, and how to check the next promise.guide-02-what-operating-data-centers-delivered-v6-65907b.pdf · DownloadDocumentBooklets and Guides, Energy, Hyperscale, Local & StatePDF385 KBNovember 22, 2026
Guide 1: Who Pays When a Data Center Falls ThroughSeries: Guides · Part 2Booklet · Idaho Data Center Public Guide 1 of 9 · Version 7. Idaho Power builds lines and buys power for a data center before it pays a single bill. If the data center leaves early, somebody covers what's left. This guide shows who, and how to keep it from being you.guide-01-who-pays-when-a-data-center-falls-through-v7-396209.pdf · DownloadDocumentBooklets and Guides, Energy, Hyperscale, Local & StatePDF407 KBNovember 22, 2026
Would They Come Anyway? Do Tax Breaks Bring Data Centers to Idaho?Series: Guides · Part 13Booklet · Idaho Data Center Public Guide 6 of 9 · Version 9. Idaho and its counties give data centers big tax breaks to come here. The best evidence says most would come without them. This guide shows what Idaho gives away, what it gets back, and who picks up the difference.guide-06-do-tax-breaks-bring-data-centers-to-idaho-v9-c60050.pdf · DownloadDocumentBooklets and Guides, HyperscalePDF436 KBNovember 22, 2026
Milner Gas Power Plant, Part 4: Questions That Need AnswersSeries: South Hills - Milner Project · Part 30Mini documentary, 5:13, widescreen. Part 4 of 4 lists the open questions on the Milner gas plant, who should answer them and how to ask, from the PUC and Twin Falls County to DEQ's coming air permit. Questions put in writing become part of the record, answered or not. Narrated by Laurel, an ElevenLabs voice.milner-mini-documentary-04-questions-that-need-answers-part-4-19mb-22dc1a.mp4 · Download
Play
VideoEnergy, Local & StateMP417.8 MBNovember 19, 2026
Milner Gas Power Plant, Part 3: The Paper TrailSeries: South Hills - Milner Project · Part 29Mini documentary, 7:15, widescreen. Part 3 of 4 follows the paper trail on the Milner gas plant, with names and page numbers: testimony, staff comments, county records and the land transfer to Idaho Power, plus H.B. 911, the 2026 law that makes a new load of 50 megawatts or more responsible for its full cost of service. Narrated by Laurel, an ElevenLabs voice.milner-mini-documentary-03-the-paper-trail-part-3-19mb-4b9efa.mp4 · Download
Play
VideoEnergy, Local & StateMP417.9 MBNovember 19, 2026
Milner Gas Power Plant, Part 2: The Normal Road, and the One Milner TookSeries: South Hills - Milner Project · Part 28Mini documentary, 8:05, widescreen. Part 2 of 4 walks through the normal permitting road for a power plant in Idaho (PUC certificate, county land use, air permit, federal license) and where the Milner project took a different path, including a draft federal filing sent to eight organizations with no county office and no neighbors. Narrated by Laurel, an ElevenLabs voice.milner-mini-documentary-02-the-normal-road-and-the-one-milner-took-part-2-19mb-ba7c39.mp4 · Download
Play
VideoEnergy, Local & StateMP417.8 MBNovember 19, 2026
Milner Gas Power Plant, Part 1: What's Coming to Milner DamSeries: South Hills - Milner Project · Part 27Mini documentary, 5:54, widescreen. Part 1 of 4 on the gas plant of up to 222 megawatts that Idaho Power now calls South Hills, below Milner Dam: what is planned, why the name changed, the Silver Spur pipeline that would feed it, and what Idaho Power has said about who the power is for. Narrated by Laurel, an ElevenLabs voice.milner-mini-documentary-01-whats-coming-to-milner-dam-part-1-19mb-3a56b4.mp4 · Download
Play
VideoEnergy, Local & StateMP417.8 MBNovember 19, 2026
Milner Evidence Short 10: The Deadlines You Can Still MakeSeries: South Hills - Milner Project · Part 12Vertical short, 1:28. The documents behind Milner Gas Power Plant video 10, on screen: the Dec. 9 Silver Spur session, Dec. 14 comment deadlines in PF26-15 and IPC-E-26-07, and the FERC docket open for comment. Narrated by Laurel, an ElevenLabs voice.milner-evidence-short-10-the-deadlines-you-can-still-make-v1-19mb-76c343.mp4 · Download
Play
VideoEnergy, Local & StateMP417.5 MBNovember 19, 2026
Milner Evidence Short 9: Twelve Stacks, No Emissions NumbersSeries: South Hills - Milner Project · Part 11Vertical short, 1:22. The documents behind Milner Gas Power Plant video 9, on screen: what Idaho's air rule, IDAPA 58.01.01.201, requires before construction, and Idaho Power's project page on when DEQ would issue the permit. Narrated by Laurel, an ElevenLabs voice.milner-evidence-short-09-twelve-stacks-no-emissions-numbers-v1-19mb-d2756a.mp4 · Download
Play
VideoEnergy, Local & StateMP417.6 MBNovember 19, 2026
Milner Evidence Short 8: Agencies Got 60 Days. Neighbors Weren't on the List.Series: South Hills - Milner Project · Part 10Vertical short, 1:23. The documents behind Milner Gas Power Plant video 8, on screen: how a federal dam license and its project boundary work, and Idaho Power's FERC request on docket P-2899-157. Narrated by Laurel, an ElevenLabs voice.milner-evidence-short-08-agencies-got-60-days-neighbors-werent-on-the-list-v1-19mb-9f080a.mp4 · Download
Play
VideoEnergy, Local & StateMP417.6 MBNovember 19, 2026
Milner Evidence Short 7: Money Down on Engines Before the State RuledSeries: South Hills - Milner Project · Part 9Vertical short, 1:24. The documents behind Milner Gas Power Plant video 7, on screen: Idaho Power's reply comments stating that a payment for the reciprocating engines for South Hills was made in June 2026, and the open state case. Narrated by Laurel, an ElevenLabs voice.milner-evidence-short-07-money-down-on-engines-before-the-state-ruled-v1-19mb-837337.mp4 · Download
Play
VideoEnergy, Local & StateMP417.8 MBNovember 19, 2026
Milner Evidence Short 6: Solar Needed a Hearing. The Gas Plant Hasn't Had One.Series: South Hills - Milner Project · Part 8Vertical short, 1:26. The documents behind Milner Gas Power Plant video 6, on screen: the PUC's notice of modified procedure in IPC-E-26-04, which says the public interest may not require a formal hearing. Narrated by Laurel, an ElevenLabs voice.milner-evidence-short-06-solar-on-potato-cellars-needed-a-hearing-the-gas-plant-hasnt-had-one-v1-19mb-6acd8e.mp4 · Download
Play
VideoEnergy, Local & StateMP417.6 MBNovember 19, 2026
Milner Evidence Short 5: A New Gas Pipeline, and Eminent Domain if ApprovedSeries: South Hills - Milner Project · Part 7Vertical short, 1:26. The documents behind Milner Gas Power Plant video 5, on screen: FERC's Federal Register notice for the Dec. 9 Silver Spur scoping session at Magic Valley High School in Twin Falls, docket PF26-15. Narrated by Laurel, an ElevenLabs voice.milner-evidence-short-05-a-new-gas-pipeline-and-eminent-domain-if-approved-v1-19mb-02fd4a.mp4 · Download
Play
VideoEnergy, Local & StateMP417.6 MBNovember 19, 2026
Milner Evidence Short 4: Largest Customers Drive 88% of the GrowthSeries: South Hills - Milner Project · Part 6Vertical short, 1:26. The documents behind Milner Gas Power Plant video 4, on screen: PUC staff's math on Idaho Power's own load forecast, with the largest-customer class making up 88 percent of growth between 2026 and 2030. Narrated by Laurel, an ElevenLabs voice.milner-evidence-short-04-largest-customers-drive-88-percent-of-the-growth-v1-19mb-d0b215.mp4 · Download
Play
VideoEnergy, Hyperscale, Local & StateMP417.7 MBNovember 19, 2026
Milner Evidence Short 3: The Name Missing From the State's NoticesSeries: South Hills - Milner Project · Part 5Vertical short, 1:23. The documents behind Milner Gas Power Plant video 3, on screen: Idaho Power's testimony on why the project was renamed South Hills, and the PUC notices in case IPC-E-26-04 that never say Milner or Twin Falls County. Narrated by Laurel, an ElevenLabs voice.milner-evidence-short-03-the-name-missing-from-the-states-notices-v1-19mb-5112f4.mp4 · Download
Play
VideoEnergy, Local & StateMP417.7 MBNovember 19, 2026
Milner Evidence Short 2: Bid as a Battery, Swapped for GasSeries: South Hills - Milner Project · Part 4Vertical short, 1:30. The documents behind Milner Gas Power Plant video 2, on screen: the 60 megawatt Milner battery bid, the request for updated pricing that brought back gas engines of up to 222 megawatts, and PUC staff comments and Commission orders on competitive bidding. Narrated by Laurel, an ElevenLabs voice.milner-evidence-short-02-bid-as-a-battery-swapped-for-gas-v1-19mb-ea9df6.mp4 · Download
Play
VideoEnergy, Local & StateMP417.6 MBNovember 19, 2026
Milner Evidence Short 1: Only a Building PermitSeries: South Hills - Milner Project · Part 3Vertical short, 1:28. The documents behind Milner Gas Power Plant video 1, on screen: Idaho Power's own testimony that, at this time, a conditional use permit is not required in Twin Falls County, only a building permit, and its project page on noise with no decibel figure. Narrated by Laurel, an ElevenLabs voice.milner-evidence-short-01-up-to-222-megawatts-idaho-power-says-the-county-requires-only-a-building-permit-v1-19mb-1aa9b0.mp4 · Download
Play
VideoEnergy, Local & StateMP417.6 MBNovember 19, 2026
Milner Gas Power Plant 10 of 10: The Deadlines You Can Still MakeSeries: South Hills - Milner Project · Part 26Vertical video, 1:52. The state comment period on the Milner gas plant closed July 31, but the calendar isn't empty: the Dec. 9 Silver Spur pipeline session in Twin Falls, Dec. 14 deadlines for pipeline comments and for public comments in the large-load cost case, FERC docket P-2899-157 at any time, the coming DEQ air permit, and 21 days to ask for reconsideration after a final order. Twin Falls County: 208-736-4068. PUC: 208-334-0300. Narrated by Laurel, an ElevenLabs voice.milner-main-10-the-deadlines-you-can-still-make-v3-19mb-3b8d3a.mp4 · Download
Play
VideoEnergy, Local & StateMP417.6 MBNovember 19, 2026
Milner Gas Power Plant 9 of 10: Twelve Stacks, No Emissions NumbersSeries: South Hills - Milner Project · Part 25Vertical video, 2:17. Idaho Power's Milner gas plant, filed as South Hills, has twelve engines and twelve exhaust stacks in its rendering, and no emissions numbers on its project page. As of Nov. 19, 2026, no air permit application for the plant appears on DEQ's public comment page, and Idaho's air rules bar construction without a permit to construct, with a few exceptions. Watch DEQ's page for "South Hills" or "Idaho Power Company"; a written request opens a comment period. Narrated by Laurel, an ElevenLabs voice.milner-main-09-twelve-stacks-no-emissions-numbers-v4-19mb-16f90c.mp4 · Download
Play
VideoEnergy, Local & StateMP417.8 MBNovember 19, 2026
Milner Gas Power Plant 8 of 10: Agencies Got 60 Days. Neighbors Weren't on the List.Series: South Hills - Milner Project · Part 24Vertical video, 2:32. On June 24, 2026, Idaho Power emailed a draft federal filing about its Milner plant site to nine people at eight organizations, including federal agencies, Idaho Fish and Game, Twin Falls Canal Company, two tribes and the State Historical Society, and gave them 60 days to comment. The filing asks to pull about a tenth of an acre out of the Milner hydro project boundary for the plant's fenced yard. Neighbors weren't on the list. Anyone can comment on FERC docket P-2899-157. Narrated by Laurel, an ElevenLabs voice.milner-main-08-agencies-got-60-days-neighbors-werent-on-the-list-v3-19mb-638b02.mp4 · Download
Play
VideoEnergy, Local & StateMP417.8 MBNovember 19, 2026
Milner Gas Power Plant 7 of 10: Money Down on Engines Before the State RuledSeries: South Hills - Milner Project · Part 23Vertical video, 2:34. Idaho Power's reply says a payment for the reciprocating engines for its Milner gas plant was made in June 2026, with the state case still open. It also wants customers charged construction interest back to December 2025. PUC staff wants interest to start only after an approval order, with a hard cap on what customers pay. From the free-market side, a company that bets early should carry that bet. Idaho PUC: 208-334-0300. Narrated by Laurel, an ElevenLabs voice.milner-main-07-money-down-on-engines-before-the-state-ruled-v3-19mb-791bfd.mp4 · Download
Play
VideoEnergy, Local & StateMP417.9 MBNovember 19, 2026
Milner Gas Power Plant 6 of 10: Solar on Potato Cellars Needed a Hearing. The Gas Plant Hasn't Had One.Series: South Hills - Milner Project · Part 22Vertical video, 3:13. The gas plant at Milner, filed as South Hills, has had no public hearing on the record at the PUC or the county. The PUC set the case for a decision on written comments, and as of Nov. 19, 2026, no ruling had been posted on a July request for public hearings. Meanwhile about 110 kilowatts of solar on potato cellars near Hansen needed a conditional use permit and a hearing. Twin Falls County: 208-736-4068. PUC: 208-334-0300. Narrated by Laurel, an ElevenLabs voice.milner-main-06-solar-on-potato-cellars-needed-a-hearing-the-gas-plant-hasnt-had-one-v3-19mb-45679d.mp4 · Download
Play
VideoEnergy, Local & StateMP417.9 MBNovember 19, 2026
Milner Gas Power Plant 5 of 10: A New Gas Pipeline, and Eminent Domain if ApprovedSeries: South Hills - Milner Project · Part 21Vertical video, 2:45. The Silver Spur pipeline would run about 88 miles of 24-inch pipe from Elko County, Nevada, into Twin Falls County, and approval brings the right of eminent domain. Natural Gas Intelligence reported Idaho Power signed for 175,000 dekatherms a day of its roughly 275,000, and Idaho Power's testimony ties pipeline capacity to its new plants. FERC public session Wednesday, Dec. 9, 5 to 8 p.m., Magic Valley High School, 512 Main Avenue North, Twin Falls; comments by Dec. 14 on docket PF26-15. Narrated by Laurel, an ElevenLabs voice.milner-main-05-a-new-gas-pipeline-and-eminent-domain-if-approved-v3-19mb-fcea8f.mp4 · Download
Play
VideoEnergy, Local & StateMP417.8 MBNovember 19, 2026
Milner Gas Power Plant 4 of 10: Largest Customers Drive 88% of the GrowthSeries: South Hills - Milner Project · Part 20Vertical video, 2:54. Idaho Power says its new gas plant at Milner serves Magic Valley customers. PUC staff found its largest-customer class grows from 258 to 875 average megawatts between 2026 and 2030, 88 percent of all growth on the system, with Micron's new chip plant alone adding about 445. The conservative principle is cost causation: customers who drive the need should pay for it. Idaho PUC: 208-334-0300. Narrated by Laurel, an ElevenLabs voice.milner-main-04-largest-customers-drive-88-percent-of-the-growth-v3-19mb-da58cd.mp4 · Download
Play
VideoEnergy, Hyperscale, Local & StateMP417.9 MBNovember 19, 2026
Milner Gas Power Plant 3 of 10: The Name Missing From the State's NoticesSeries: South Hills - Milner Project · Part 19Vertical video, 2:33. The Public Utilities Commission's two formal notices on Idaho Power's gas plant at Milner Dam never use the word Milner or name Twin Falls County; the plant is filed as South Hills, a name Idaho Power testified it chose to prevent internal confusion with its Milner hydro plant. The South Hills are the mountains south of Twin Falls, while the site sits on the valley floor. Search both names; the state case is IPC-E-26-04. Narrated by Laurel, an ElevenLabs voice.milner-main-03-the-name-missing-from-the-states-notices-v3-19mb-4c3338.mp4 · Download
Play
VideoEnergy, Local & StateMP417.8 MBNovember 19, 2026
Milner Gas Power Plant 2 of 10: Bid as a Battery, Swapped for GasSeries: South Hills - Milner Project · Part 18Vertical video, 3:31. What competitive bidding is and why it matters, then what happened at Milner. Idaho Power's own bid team entered a 60 megawatt battery; after it made the shortlist, the bid came back as a gas plant of up to 222 megawatts. PUC staff says the company effectively bypassed the RFP selection process, and Idaho Power calls that incorrect. Staff still recommends approval, with a hard cap on costs. Idaho PUC: 208-334-0300. Narrated by Laurel, an ElevenLabs voice.milner-main-02-bid-as-a-battery-swapped-for-gas-v3-19mb-f43ed2.mp4 · Download
Play
VideoEnergy, Local & StateMP417.9 MBNovember 19, 2026
Milner Gas Power Plant 1 of 10: Up to 222 Megawatts. Idaho Power Says the County Requires Only a Building Permit.Series: South Hills - Milner Project · Part 17Vertical video, 2:39. Idaho Power plans a natural gas plant of up to 222 megawatts on a pivot field just downstream from Milner Dam, now filed as South Hills: twelve engines in two engine halls on a 20-acre parcel. The project page promises noise-reduction measures and gives no decibel figure, and Idaho Power testified the county requires only a building permit. Twin Falls County commissioners: 208-736-4068. Narrated by Laurel, an ElevenLabs voice.milner-main-01-up-to-222-megawatts-idaho-power-says-the-county-requires-only-a-building-permit-v3-19mb-26f425.mp4 · Download
Play
VideoEnergy, Local & StateMP417.8 MBNovember 19, 2026
Your Seat at the TableVertical video, 1:22. BAAJA, the Senate permitting bill, narrows federal environmental review under NEPA and ties the right to go to court to whether a person commented first, with 150 days to file. Why public hearings and written comments matter more under the bill, how Idaho's senators voted, and who to call. Status as of Nov. 17, 2026. Narrated by Laurel, an ElevenLabs voice.your-seat-at-the-table-vertical-v5-laurel-19mb-c4c76c.mp4 · Download
Play
VideoNationalMP43.5 MBNovember 19, 2026
Smith, Reagan, Eisenhower: The Conservative Case Against SubsidiesVertical video, 2:09. Adam Smith on merchants who meet and end up scheming against the public, and Ronald Reagan's line on the government habit of taxing, regulating and then subsidizing. Since 2020 a qualifying Idaho data center has paid no sales tax on servers and new buildings, with no end date, while Georgia's own state audit estimated 70 percent of its data centers would have come without its break. How much is Idaho giving up? Narrated by Laurel, an ElevenLabs voice.smith-reagan-eisenhower-vertical-v4-laurel-19mb-8c8fc6.mp4 · Download
Play
VideoHyperscale, PoliticsMP416.5 MBNovember 19, 2026
Public Land for Mine WasteVertical video, 0:54. BAAJA Section 2215 would let mining claim holders set up 5-acre mill sites on federal land for waste rock and tailings, whether or not the land holds minerals, as many as are "reasonably necessary," for $400 a site each year. Who decides how much of Idaho's public land goes to mine waste? Status as of Nov. 17, 2026. Narrated by Laurel, an ElevenLabs voice.public-land-for-mine-waste-vertical-v1-laurel-19mb-d3370e.mp4 · Download
Play
VideoLocal & State, NationalMP41.8 MBNovember 19, 2026
Permitted Today, Locked In TomorrowVertical video, 1:32. BAAJA Title IV would make a valid federal permit much harder to take back. If an agency pulls one and can't justify it in court, the company can collect fees and delay costs, plus 25 to 50 percent of its development and construction costs if the agency acted in bad faith. Section 1402 allows 50 to 100 percent of a project's expected construction cost, paid from the federal Judgment Fund with no new vote by Congress. Status as of Nov. 17, 2026. Narrated by Laurel, an ElevenLabs voice.permitted-today-locked-in-tomorrow-vertical-v2-laurel-19mb-921684.mp4 · Download
Play
VideoNationalMP43.1 MBNovember 19, 2026
How Data Centers Became a Test of PatriotismVertical video, 2:29. People who ask hard questions about data centers are told they're helping China; the House speaker called the opposition a Chinese psyop. Yet a Fox News poll found 70 percent of voters oppose a data center near them, and on Nov. 3, 2026, voters favored limits in 40 of 41 local ballot measures. Edmund Burke's "little platoon" and the conservative case that asking where the bill lands and where the water goes is how free people govern themselves. Narrated by Laurel, an ElevenLabs voice.patriotism-test-vertical-v3-laurel-19mb-9ffba7.mp4 · Download
Play
VideoHyperscale, PoliticsMP414.6 MBNovember 19, 2026
Make Data Centers Pay Their WayVertical video, 1:09. The one part of BAAJA worth keeping. Section 2107 says data centers should bear the full cost of the electric service and lines they need. FERC would have 90 days to start rewriting transmission pricing, and on retail bills no part of the added cost of serving a new data center could be put on any other customer. Status as of Nov. 17, 2026. Narrated by Laurel, an ElevenLabs voice.make-data-centers-pay-their-way-vertical-v2-laurel-19mb-9a5ee2.mp4 · Download
Play
VideoEnergy, Hyperscale, NationalMP42.4 MBNovember 19, 2026
Idaho's Water, Washington's ClockVertical video, 1:01. Under Clean Water Act Section 401, Idaho reviews federal permits for projects that could pollute its rivers and streams. BAAJA Section 1202 would require clear and convincing evidence for a denial, cap the review at one year (nine months for interstate power lines and gas pipelines), and treat a missed deadline as a waiver. Status as of Nov. 17, 2026. Narrated by Laurel, an ElevenLabs voice.idahos-water-washingtons-clock-vertical-v2-laurel-19mb-0e9798.mp4 · Download
Play
VideoLocal & State, NationalMP42.1 MBNovember 19, 2026
Idaho Energy Rush: Who Decides on Public Land?Video, 6:04, widescreen. Solar, battery and data center proposals headed for BLM land in southern Idaho. The Snake River Energy solar farm grew from 400 megawatts on about 4,600 acres to up to 1,000 megawatts of solar plus batteries on about 6,150 acres. The BLM will study it in one review with Rhea Data's campus south of Boise, and Copia's Falcon data center sits near the Midpoint substation. County zoning covers private land, so on federal ground counties can only take part as cooperating agencies. Ends with a free-market view. Narrated by Laurel, an ElevenLabs voice.idaho-energy-rush-landscape-v1-laurel-19mb-bbbc88.mp4 · Download
Play
VideoEnergy, Hyperscale, Local & StateMP49.9 MBNovember 19, 2026
Fewer Chances to Be HeardVertical video, 1:26. BAAJA keeps the laws that give citizens a voice and cuts the openings. Program-wide reviews would last 10 years instead of 5, agencies could borrow each other's lists of projects that skip review, grid and pipeline work in existing corridors would skip environmental and historic review, and wetland permit challenges would need a prior comment and a 150-day filing. Status as of Nov. 17, 2026. Narrated by Laurel, an ElevenLabs voice.fewer-chances-to-be-heard-vertical-v1-laurel-19mb-9681e4.mp4 · Download
Play
VideoNationalMP43 MBNovember 19, 2026
BAAJA and Your LandVertical video, 1:47. A Facebook post claims the Senate wants to let companies take private land for data centers. The bill tells a narrower story: Section 2101 would let federal regulators permit interstate power lines of 230 kilovolts or more almost anywhere, with eminent domain for permit holders who can't reach a deal with a landowner. The American Farm Bureau's warning, Idaho's limited siting role, and how Sens. Crapo and Risch voted. Status as of Nov. 17, 2026. Narrated by Laurel, an ElevenLabs voice.baaja-and-your-land-vertical-v1-laurel-19mb-7a403f.mp4 · Download
Play
VideoEnergy, NationalMP417 MBNovember 19, 2026
Where Idaho's Data Centers Really AreVertical video, 2:17. What is on the public record as of Nov. 13, 2026. One hyperscale data center is running, Meta's near Boise. Rhea Data and Copia want federal land. TerraVolt holds land options near Declo but hasn't filed with Cassia County. Mountain Home passed a moratorium a week after plans were dropped off, and Pocatello said no and the developer went to court. Boise, Mountain Home, Elmore, Bannock and Blaine now have moratoriums. Narrated by Laurel, an ElevenLabs voice.where-idaho-data-centers-are-vertical-v4-laurel-19mb-587dcd.mp4 · Download
Play
VideoHyperscale, Local & StateMP414.7 MBNovember 19, 2026
Solar for the ServersVideo, 4:46, widescreen. In January 2025 the BLM took public input on Arevia Power's Taurus Wind and Snake River Energy solar projects in three south central Idaho counties. BLM officials now tie that solar farm to Rhea Data's proposed data center south of Boise, and Copia is in early talks with the BLM on a second data center near the Midpoint Substation. Also covers what counties can decide on federal land, Executive Order 14318 and when public comment opens. Includes a labeled free-market opinion segment. Narrated by Laurel, an ElevenLabs voice. Revision 3.solar-for-the-servers-v3-laurel-19mb-27f836.mp4 · Download
Play
VideoEnergy, Hyperscale, Local & StateMP410.7 MBNovember 19, 2026
The SMRs Worth WatchingVertical video, 2:19. Four test reactors went critical by July 4, 2026, three of them at Idaho National Laboratory. Then Crusoe and Aalo announced a small data center at INL powered by an Aalo reactor, aiming for 2027. A company that pays for its own reactor, fuel, safety and cleanup keeps its power bill off everyone else's. The open questions: who pays if it stalls, and where the used fuel ends up. Narrated by Laurel, an ElevenLabs voice.smrs-worth-watching-vertical-v6-laurel-19mb-291b63.mp4 · Download
Play
VideoEnergy, HyperscaleMP417.1 MBNovember 19, 2026
How to Read a Developer's SEC Filings in Five MinutesVertical video, 2:27. When a publicly traded developer promises a county jobs and a cleanup bond, its SEC reports are free on sec.gov. Search the 10-Q for "going concern." TerraVolt's June 2026 report says there is substantial doubt about its ability to continue as a going concern, its filings name no customer, and its Declo land is under option, not owned. A rezone can outlive the company that asked for it. Narrated by Laurel, an ElevenLabs voice.read-the-10q-vertical-v4-laurel-19mb-ae5ab6.mp4 · Download
Play
VideoHyperscale, Local & StateMP417.2 MBNovember 19, 2026
Off the Grid, Off the Hook?Vertical video, 2:19. TerraVolt wants a data center near Declo that makes its own power: 240 megawatts of natural gas behind the meter. Idaho's new ratepayer protection law, H.B. 911, works through a contract between a utility and its big customer, so a plant that never buys from the grid has no contract to test. The company's SEC filings warn of substantial doubt about staying in business and name no data center customer. Questions for Cassia County: who is the customer, who pays to tear it down, and who pays if it ever ties to the grid. Narrated by Laurel, an ElevenLabs voice.off-the-grid-off-the-hook-vertical-v5-laurel-19mb-6790f5.mp4 · Download
Play
VideoEnergy, Hyperscale, Local & StateMP417.4 MBNovember 19, 2026
Meta's Idaho Data Center, By the NumbersVertical video, 2:36. Meta's data center near Boise is Idaho's only confirmed hyperscale data center, and the numbers keep moving: announced in 2022 at $800 million, online in 2026 at $1.2 billion, and a water system that grew from $50 million to more than $100 million, all company figures. Its power use is confidential, and the state hasn't said what the sales tax exemption has saved Meta. A third amendment to its power contract is before the PUC in case IPC-E-26-25, with comments due Dec. 9. Narrated by Laurel, an ElevenLabs voice.meta-by-the-numbers-vertical-v4-laurel-19mb-216c26.mp4 · Download
Play
VideoEnergy, HyperscaleMP410.5 MBNovember 19, 2026
How a Data Center Moratorium WorksVertical video, 2:42. Since July 2026, Elmore County, Bannock County, Blaine County, Mountain Home and Boise have paused data centers. A moratorium is a temporary stop while a city or county writes permanent rules, and Idaho law limits an emergency moratorium to 182 days. If no permanent rules pass, the old rules may apply again. How to watch the planning and zoning schedule, read the draft and comment in writing. Narrated by Laurel, an ElevenLabs voice.how-a-moratorium-works-vertical-v4-laurel-19mb-19f42e.mp4 · Download
Play
VideoHyperscale, Local & StateMP48.9 MBNovember 19, 2026
From Server Rooms to National StrategyVideo, 2:49. How data centers went from company server rooms to a national strategy: electricity use from 58 TWh in 2014 to 176 TWh in 2023, the 2025 Stargate announcement, Executive Orders 14179 and 14318, and the AI Action Plan. Then the 2026 claims that local opposition is a China influence campaign, set against polling of Trump voters. Ends with a free-market view: a project that is good business should pay its own way, and neighbors should get a real say. Narrated by Laurel, an ElevenLabs voice. Revision 2.from-server-rooms-to-national-strategy-v2-laurel-19mb-015006.mp4 · Download
Play
VideoAI, Energy, Hyperscale, National, PoliticsMP418.1 MBNovember 19, 2026
Decide First, Explain LaterVertical video, 2:23. On July 24, 2026, Gov. Brad Little signed a preliminary memorandum with the Energy Department on a nuclear campus, putting Idaho among five contenders. The memorandum, obtained by the Idaho Capital Sun, says any future host agreement shall provide for the acceptance of out-of-state used nuclear fuel, to be recycled for newer reactors. That runs into the 1995 Settlement Agreement, and the public saw the terms after the signature. Former Chief Justice Jim Jones has asked for public hearings. Narrated by Laurel, an ElevenLabs voice.decide-first-explain-later-vertical-v6-laurel-19mb-e52fa0.mp4 · Download
Play
VideoEnergy, Local & StateMP417.3 MBNovember 19, 2026
Brownfields FirstVertical video, 2:07. Good farm ground takes generations to build, while old industrial sites already have roads, power lines and industrial zoning. Executive Order 14318 tells the EPA to identify brownfield and Superfund sites for large data centers but doesn't require developers to use them. The position here: farmland should never be rezoned for hyperscale projects, and used ground comes first. Pocatello's two denials at the old Hoku site show used ground still needs the homework. Narrated by Laurel, an ElevenLabs voice.brownfields-first-vertical-v5-laurel-19mb-36c4ef.mp4 · Download
Play
VideoHyperscale, Local & StateMP416.9 MBNovember 19, 2026
Feeding the Beast Brief, Nov. 19, 2026Vol. I, No. 5.feeding-the-beast-brief-2026-11-19-0f951e.pdf · DownloadDocumentFeeding the BeastPDF3.2 MBNovember 19, 2026
Feeding the Beast Brief, Nov. 17, 2026 (rev. 3)Vol. I, No. 4.feeding-the-beast-brief-2026-11-17-r3-eba439.pdf · DownloadDocumentFeeding the BeastPDF4 MBNovember 19, 2026
Declo - Plans to Make PlansSeries: Delco Idaho Data Center Campus · Part 16Clip 16 of 16. A Twin Falls resident asks what training programs exist so the permanent jobs go to locals. TerraVolt says it intends to work with trade schools and colleges in southern Idaho. The exchange ends with one line: "There are plans to make plans, but currently there are no plans."16-declo-town-hall-jobs-clip-nov10-8-36-13-to-8-37-28pm-19mb-2e9117.mp4 · Download
Play
VideoHyperscale, Local & StateMP417.3 MBNovember 18, 2026
Declo - Who DecidesSeries: Delco Idaho Data Center Campus · Part 15Clip 15 of 16. Asked whether Idaho or the county has data center rules, TerraVolt says the county has none yet and "The state does not regulate land use. The county regulates land use."15-declo-town-hall-who-regulates-clip-nov10-8-34-58-to-8-36-10pm-19mb-fe512e.mp4 · Download
Play
VideoHyperscale, Local & StateMP417.3 MBNovember 18, 2026
Declo - What Are They SellingSeries: Delco Idaho Data Center Campus · Part 14Clip 14 of 16. Asked what would draw a data center company to the site, TerraVolt says, "So an entitled piece of property would be the key," meaning county approvals in hand, followed by power, cooling and connectivity.14-declo-town-hall-what-draws-buyers-clip-nov10-8-30-03-to-8-32-08pm-19mb-25bbde.mp4 · Download
Play
VideoHyperscale, Local & StateMP417.4 MBNovember 18, 2026
Declo - What Comes Out of the StacksSeries: Delco Idaho Data Center Campus · Part 13Clip 13 of 16. A resident asks what emission limits TerraVolt would accept on its natural gas generators and asks for independent air modeling and baseline monitors. TerraVolt says Idaho DEQ sets the limits after county approval and the plant would need a Tier I permit with continuous emissions monitoring on the stacks.13-declo-town-hall-air-clip-nov10-8-22-09-to-8-28-15pm-19mb-b16225.mp4 · Download
Play
VideoHyperscale, Local & StateMP417.7 MBNovember 18, 2026
Declo - Why They Left CaliforniaSeries: Delco Idaho Data Center Campus · Part 12Clip 12 of 16. TerraVolt explains why its Imperial Valley project in California ended: permit delays, Berkshire Hathaway pulling out on power, and county approvals tied up in the Lithium Valley plan. It calls Idaho "a much more business friendly state."12-declo-town-hall-california-clip-nov10-8-20-21-to-8-21-57pm-19mb-55a5d1.mp4 · Download
Play
VideoHyperscale, Local & StateMP417.4 MBNovember 18, 2026
Declo - Who Pays for the Fire TrucksSeries: Delco Idaho Data Center Campus · Part 11Clip 11 of 16. A resident asks who pays to get local fire and EMS crews ready for a fire at an industrial power and data campus. TerraVolt describes on-site water tanks, sprinklers and staff and says "there would have to be some funding for the fire department," but won't say yet what it would commit to.11-declo-town-hall-fire-ems-clip-nov10-8-16-44-to-8-20-22pm-19mb-877283.mp4 · Download
Play
VideoHyperscale, Local & StateMP417.6 MBNovember 18, 2026
Declo - Water In, Wastewater OutSeries: Delco Idaho Data Center Campus · Part 10Clip 10 of 16. TerraVolt says that since July 1, 2026, Idaho Code 42-252 bars new data centers from using water for cooling unless it comes from a municipal system, and this site isn't on one. It says the land carries 1,500 acre-feet of water rights and wastewater would be treated on site.10-declo-town-hall-water-law-clip-nov10-8-15-18-to-8-16-40pm-19mb-c4aa98.mp4 · Download
Play
VideoHyperscale, Local & StateMP417.4 MBNovember 18, 2026
Declo - Have You Built OneSeries: Delco Idaho Data Center Campus · Part 9Clip 9 of 16. A resident asks whether TerraVolt has ever completed a data center it planned and why the company changed its name from CalEthos. She asks that a 50 acre-foot water cap and a ban on cooling towers be written into the county permit.09-declo-town-hall-track-record-clip-nov10-8-13-12-to-8-15-20pm-19mb-a4b72e.mp4 · Download
Play
VideoHyperscale, Local & StateMP417.5 MBNovember 18, 2026
Declo - The Hum You Can't BlockSeries: Delco Idaho Data Center Campus · Part 8Clip 8 of 16. A resident says data center noise is low frequency and carries for miles, whatever the decibel reading at the gate. TerraVolt answers, "We can look into it. I am not aware of low frequency sound."08-declo-town-hall-noise-clip-nov10-8-03-38-to-8-04-32pm-19mb-dc0471.mp4 · Download
Play
VideoHyperscale, Local & StateMP417.3 MBNovember 18, 2026
Declo - Is This Even AllowedSeries: Delco Idaho Data Center Campus · Part 7Clip 7 of 16. A Burley resident asks whether a data center is allowed on the property now. TerraVolt says no. It would take an amendment to the county's multiple-use designation, and no application has been filed.07-declo-town-hall-zoning-clip-nov10-8-00-06-to-8-03-20pm-19mb-8c898b.mp4 · Download
Play
VideoHyperscale, Local & StateMP417.5 MBNovember 18, 2026
Declo - No Customer YetSeries: Delco Idaho Data Center Campus · Part 6Clip 6 of 16. TerraVolt says it has not approached any customers and wants county approval first, naming Microsoft, Google or Meta as the kind of buyer it has in mind. Asked what happens if no customer signs, it says, "If we don't contract the customer, we don't build the project."06-declo-town-hall-customer-clip-nov10-7-56-26-to-8-00-04pm-19mb-51cc90.mp4 · Download
Play
VideoHyperscale, Local & StateMP417.6 MBNovember 18, 2026
How Opposing Data Centers Got Framed as a China IssueInfographic timeline. Eight dated events from June 4 to Sept. 28, 2026, each with the outlet that reported it, from the House Energy and Commerce letter to the FBI through Speaker Mike Johnson's 'Chinese psyop' remark. Includes the Economist/YouGov poll finding 47% of 2024 Trump voters opposed a new data center in their community.infographic-2-china-framing-v1-663ab5.png · DownloadInfographicAI, Hyperscale, National, PoliticsPNG298 KBNovember 18, 2026
From Server Rooms to National Strategy: The Evolution of U.S. Data CentersInfographic. U.S. data center electricity use grew from about 58 TWh in 2014 to 176 TWh in 2023, with 325 to 580 TWh projected for 2028 (Lawrence Berkeley National Laboratory). Also shows the four data center categories (Congressional Research Service) and the 2025 timeline from the Stargate announcement to Executive Order 14318.infographic-1-from-server-rooms-to-national-strategy-v1-4c39c4.png · DownloadInfographicAI, Energy, Hyperscale, NationalPNG5 MBNovember 18, 2026
From Server Rooms to National Strategy (Slides)10-slide deck, PDF. The slides behind the From Server Rooms to National Strategy video: the four kinds of data centers, U.S. data center electricity use from 2014 to a 2028 projection, the 2025 federal strategy, the June to September 2026 rhetoric about opponents, the Economist/YouGov poll and a free-market view. Each slide lists its source.slides-from-server-rooms-to-national-strategy-v1-1cb1fd.pdf · DownloadSlidesAI, Energy, Hyperscale, National, PoliticsPDF1.8 MBNovember 18, 2026
Public Land, Less Public SayVertical video, 2:26. On Nov. 10, 2026, the BLM proposed a rule that would drop the 90-day comment period on draft land-use plans and cap any comment period at 30 days, with no more than 30 days added. The video shows why comments mattered in Wyoming's Rock Springs plan, which drew more than 35,000 of them. Comments close Jan. 11, 2027, at regulations.gov, docket BLM-2026-0298. Includes a labeled conservative-view segment. Narrated by Laurel, an ElevenLabs voice.public-land-less-public-say-vertical-v3-laurel-19mb-3ab8ad.mp4 · Download
Play
VideoEnergy, National, PoliticsMP418 MBNovember 18, 2026
Public Land, Less Public Say (Audio)Audio narration of the Public Land, Less Public Say video, 2:21, MP3. On Nov. 10, 2026, the BLM proposed a rule that would drop the 90-day comment period on draft land-use plans and cap any comment period at 30 days, with no more than 30 days added. Comments close Jan. 11, 2027 (docket BLM-2026-0298). Narrated by Laurel, an ElevenLabs voice.public-land-less-public-say-narration-v3-laurel-244984.mp3 · Download
Play
AudioEnergy, National, PoliticsMP33.2 MBNovember 18, 2026
Solar for the Servers (Audio)Audio narration of the Solar for the Servers video, 4:52, MP3. In January 2025 the BLM took public input on Arevia Power's Taurus Wind and Snake River Energy solar projects in Gooding, Jerome and Lincoln counties. BLM officials now tie that solar farm to Rhea Data's proposed data center south of Boise. Narrated by Laurel, an ElevenLabs voice.solar-for-the-servers-narration-v2-laurel-806698.mp3 · Download
Play
AudioEnergy, Hyperscale, Local & StateMP36.7 MBNovember 18, 2026
Feeding the Beast Brief: Friday, Nov. 13, 2026Vol. I, No. 1, trial edition (rev. 3). Nine pages, 25 stories on power, land, data and liberty in Idaho and the nation. Lead: the Boise City Council paused applications for data centers of 100,000 square feet or 20 megawatts. Also inside: Declo residents press a developer on a 240-megawatt data center, and the Senate advances an energy permitting overhaul, 73-25.feeding-the-beast-brief-2026-11-13-r3-ebd2aa.pdf · DownloadDocumentFeeding the Beast, Local & State, NationalPDF5.4 MBNovember 17, 2026
Feeding the Beast Brief: Saturday, Nov. 14, 2026Vol. I, No. 2. Seven pages, 12 stories. Lead: eight Idaho counties drew post-election audits, including Latah and Bannock, the two that left ballots out of their election night totals. Also inside: voters backed limits on data centers in 44 of 45 ballot measures, and PUC staff proposed a Jan. 8 comment deadline on Idaho Power pricing.feeding-the-beast-brief-2026-11-14-c98739.pdf · DownloadDocumentFeeding the Beast, Local & State, NationalPDF2.6 MBNovember 17, 2026
Feeding the Beast Brief: Monday, Nov. 16, 2026Vol. I, No. 3. Twelve pages, 24 stories. Correction: the lead story misread the state's first report on the private education tax credit. The application asked whether each student had ever enrolled in an Idaho public school. See the Nov. 17 brief. Also inside: a lawmaker says a $4 billion data center would pay no Idaho sales tax, and a prosecutor says the Bellevue mayor's land purchase broke state law.feeding-the-beast-brief-2026-11-16-a5e5b9.pdf · DownloadDocumentFeeding the Beast, Local & State, NationalPDF2.3 MBNovember 17, 2026
Feeding the Beast Brief: Tuesday, Nov. 17, 2026Vol. I, No. 4 (rev. 2). Eleven pages, 22 stories. Lead: Idaho's Parental Choice Tax Credit reached parents in every legislative district, and this issue corrects Monday's front-page story. Also inside: Oregon makes new Pacific Power data centers pay their own way, and a report to Congress counts 80 nuclear waste sites, 26 with no reactor.feeding-the-beast-brief-2026-11-17-r2-86b2a1.pdf · DownloadDocumentFeeding the Beast, Local & State, NationalPDF3.9 MBNovember 17, 2026
Declo - Promises MadeSeries: Delco Idaho Data Center Campus · Part 5Clip 5 of 16. A resident asks how anyone can hold TerraVolt to its promises once another company runs the campus. TerraVolt says county and state rules apply to any operator and sale documents would carry conditions and covenants.05-declo-town-hall-promises-clip-nov10-7-53-52-to-7-56-26pm-19mb-d3402d.mp4 · Download
Play
VideoHyperscale, Local & StateMP417.5 MBNovember 16, 2026
Declo - First Neighbors HeardSeries: Delco Idaho Data Center Campus · Part 4Clip 4 of 16. Families on the property line say nobody from TerraVolt talked to them before the meeting. A landowner asks about construction traffic off Highway 77, and TerraVolt says it will do a traffic study with the Idaho Transportation Department and pay for what's required.04-declo-town-hall-neighbors-clip-nov10-7-48-55-to-7-51-42pm-19mb-37165e.mp4 · Download
Play
VideoHyperscale, Local & StateMP417.5 MBNovember 16, 2026
Declo - Where is the water coming fromSeries: Delco Idaho Data Center Campus · Part 3Clip 3 of 16. A resident asks whether the cooling water would come from the Snake River or the aquifer. TerraVolt says it would come from about 1,500 acre-feet of water rights attached to the land, but doesn't say whether those rights draw on groundwater or surface water.03-declo-town-hall-water-clip-nov10-7-46-49-to-7-48-54pm-19mb-3971c5.mp4 · Download
Play
VideoHyperscale, Local & StateMP417.5 MBNovember 16, 2026
Declo - How much will they pay in taxesSeries: Delco Idaho Data Center Campus · Part 2Clip 2 of 16. A resident asks about Idaho Code 63-4502, which figures property tax on no more than $400 million once a company invests at least $1 billion. TerraVolt says it doesn't expect to reach that and believes it should pay its fair share. A Rupert resident says the company has paid nothing in taxes, and TerraVolt answers that it is a startup with no operating revenue.02-declo-town-hall-taxes-clip-nov10-7-43-16-to-7-46-46pm-19mb-0cf518.mp4 · Download
Play
VideoHyperscale, Local & StateMP417.5 MBNovember 16, 2026
Declo - What about property valuesSeries: Delco Idaho Data Center Campus · Part 1Clip 1 of 16. A man who just built a home on the west side of the TerraVolt property says this town hall was the first he'd heard of the project and asks how it will affect the value of homes nearby. TerraVolt points to its acreage and a planned buffer and says it will post an answer on its website.01-declo-town-hall-property-values-clip-nov10-7-36-22-to-7-38-19pm-19mb-e84c35.mp4 · Download
Play
VideoHyperscale, Local & StateMP417.4 MBNovember 16, 2026